Activity Based Costing in SAP SAP中的作业成本法
Introduction 概述
Activity Based Costing is a method of costing, where the cost of products, processes, customers are determined through Activities performed in the production/ support unit. It is more logical method of determining overhead cost for the product than the historically method of using machine hours or man hours to distribute the cost. In activity based costing process, first the activities are identified, which attract cost and then the total cost are distributed to product on the basis of number of activities consumed in the manufacturing and production processes. The purpose of this document is to explain how we can identify key activities in any manufacturing process and what are the things that need to be taken care while using activity based costing in SAP?        
Activity Based Costing 作业成本法
ABC is more logically, accurate, better way of allocating overhead cost, but on the other hand it’s more complicated to design and implement. If we define the processes, it includes the below steps:
a.       Determining the cost objects, the organizational unit which can be used for tracking cost and distributing to product
b.      Identifying cost carriers or the activities performed in the cost object
c.       Bifurcation between direct and indirect costs associated with activities related to cost object
d.      Identify linkage between overhead cost and activities  
e.      Select the method of overhead allocation, e.g. Push method (Assessment, Distribution cycles) or Pull method (Indirect activities allocation, template allocations)
Activity based costing is activity driven concept with a key assumption that all the overhead costs are caused by different types of activity. The main challenge of implementing this, is to identify cost driven activities and to link the overhead cost to the specify activities and designing the overall value flow.  
Method of allocating cost: 成本分配方法
i.                     Push Approach (Cost flow method) 推方式(成本流方法)
Push approach is a method of overhead allocation, where we transfer the cost from sender cost object to receiver cost object with a flow from sender to receiver. Here the full or pre-defined percentage of cost from sender cost center is transferred to receiver cost objects. It is like pushing the overhead cost from sender to receiver cost object. E.g. Assessment, Distribution
ii.                   Pull Approach (Quantity input method) 拉方式(输入数量法)
Pull approach is a method of overhead allocation, where quantities of receiver cost objects are used as a base to take the cost from sender cost centers. For example: in case of Indirect Activity Allocation, which is a method of pull approach, the activities on receiver cost objects are combined and a same values are transferred to sender cost objects as sender activity, which later on are used to transfer overhead cost from sender cost center to receiver cost centers. Here the Quantity of receiver cost centers are used as input to transfer the sender cost, that’s why it is called as Quantity input method. E.g. Direct/Indirect activity allocation, template allocations
To illustrate the scenario in more details, I have taken a hypothetical example of an automobile industry:
In general an automobile organization includes the below manufacturing departments.   
1.            Press Shop/ Stamping
Manufacturing of car start with creation of different steel plates for different parts of car, for example doors, body of cars etc. These activities are performed in press shop, where different pieces are made out of rolls of steels. These pieces are later converted into different shape with help of automatic press/stamp machine. Generally both activities are performed one after other on same or different machine. If we need to apply the concept of Activity based costing, then we need to identify the activities which are performed in press shop, for example
1. A) SETUP: setup is an activity of putting the iron plates on the machines in right places to perform the cutting and stamping. In general before cutting, a lubricant is used on iron plat so that it doesn’t get damaged while pressing. Setup is a manual process, which involve individuals to perform the activities.  
1. B) PRESSING: pressing is an activity performed by machine to cut the iron plat in the piece and then put the stamp to convert the iron plate into the design of different parts of car.
How the cost will be consider as Setup and pressing, it’s depend upon the nature of the activities, here in this example we are considering SETUP as a manual activity so all the wages paid to the workers could be consider as Variable Setup cost and cost for lubricant oil used in press shop could also be consider as variable cost. In this way we can decide activity dependent and activity independent cost and in SAP it can be used to distribute the cost to the product. The details can be seen from the below document on how to differentiate activity dependent and activity independent cost:  
Expense Analysis and Splitting in Manufacturing Cost Centers http://scn.sap.com/docs/DOC-46028
2.            Body Shop/ Welding
The next department in automobile organization is where welding of different body parts are done to shape the car. After this step the structure of car is ready. For activity based costing, we need to identify the different activities performed in body shop. Before deciding what all activities can be there, we need to validate whether having two different activities is going to have any impact on product cost for two or more products, if not, then there is no point in using the second additional activity. Suppose the organization is making only two different types of car, standard module and custom built car, suppose machines are used to weld standard modules and individual are used to weld custom module of cars. In this way we need to identify the different activities, as there is no specific rule for this. After identifying the activities we need to link the cost to the activity.   
3.            Paint Shop
The next department is Paint shop, where different layers of color coating are done on body of car based as per standard procedure or requirement by customer. Then drying/ heating activity is done to make the color permanent. All these activities like Painting activity, or drying activity can be used in activity based costing as cost carrier and used to transfer the cost of paint shop to different Production order and finally to the product.
4.            Engine Plant
In engine plant all different parts of engine are manufactured and assembled. After manufacturing of engine, it is sent to assembly line to be included in car. Here we can identify two different activities, like manufacturing of engine parts and assemble of parts. These activities can be used to track cost.  
5.            Assembly Line
The next department is assembling line, where the painted car body and its engine are assembled. Then car is sent for quality testing.
6.            Finish Line or Warehouse
The car is driven on a few miles test track to check for rattles or other issues. Once a car meets all quality standards, kept in warehouse and are ready to send to customer, dealers.
Configuration of Splitting Structure: 配置分割结构
For the purpose of splitting of fixed cost to the different activities assigned to cost center, need to define Splitting structure. It includes the rules which should be followed to distribute the fixed cost to different activities. For the purpose of Planning and Budgeting this is an important configuration.
Transaction: OKEW (Assign the new cost center to the splitting structure)

Double click on splitting structure and assign the cost centers to the respective splitting structure


Planning: 成本计划
For planning and budgeting of activities, the below processes need to be followed:
a.       Define activities on the cost centers through KP26:
After designing the overall structure of value flows, activities need to be linked to cost centers through KP26. Here we need to define Plan Activity, and Plan Capacity. Quantity defined for plan activity or capacity are used to calculate activity prices at KSPI depending upon price indicator set while defining master data. If we select price indicator as 002, then fixed activity price is calculated by considering plan capacity and variable activity price is calculated by dividing plan activity.



c.       Allocation of expenses or activities:
i.            Indirect Activity allocations: it is one of the pull approaches of allocating the cost from sender cost object to receiver cost object. Here overhead costs are allocated in two stapes process. First the sender cost centers activities are determined by combining receiver cost center activities and second the cost are allocated from sender cost center to receiver cost center/ object. It basically worked on Quantity calculated inversely. Once we execute indirect activity allocation cycles, then only activities are allocated but no cost is transferred from sender cost center to receiver cost centers. Transfer of cost to receiver cost center can only be viewed after plan cost split (KSS4) and plan activity price calculation (KSPI). It doesn’t follow the same process as assessment and distribution, for distributing the overhead cost. In assessment and distribution the cost are transferred exactly after executing the cycles.            
ii.            Distribution: It is a method of push cost allocation. Distribution cycles are used to distribute primary cost from sender cost object to receiver cost object on the basis of fixed percentage, or fix proportion, or statistical key figures.   
iii.            Assessment: It is also a method of push cost allocation. Assessment cycles are used to distribute primary & secondary cost from sender cost object to receiver cost object on the basis of fixed percentage, or fix proportion, or statistical key figures. In assessment cycles the allocation of cost done through assessment cost element.  
d.      Plan Cost Splitting through (KSS4): plan cost split distribute the plan fixed cost to the activities assigned to the cost center. The distribution of cost happened on the basis of splitting rule defined in splitting structure. So the assignment of cost centers to the splitting structure is important.
e.      Plan Activity Price calculation (KSPI): KSPI calculates plan activity price or activity rate.
f.        Product costing CK40N or CK11N & CK24  
Advantages of Activity based Costing:
Ø  Accurate product cost calculation based on based assigning overhead cost based on overhead carriers as activities.
Ø  Monitoring of direct and indirect activity cost possible with the help of controlling activities.  
Ø  More accurate calculation of profitability and selling prices for multi-product organization.
Limitations of Activity based Costing:
Ø  Not suitable and cost effective for small manufacturing organization to implement
Ø  Difficult to identify cost driver or activities performed in cost centers  
Conclusion:
With the help of this article, I have tried to focus how the concept of activity based costing can be applied in SAP. Here we can see how to identify activities in different manufacturing processes. By carefully analyzing the business process for manufacturing or production organization, we can find out cost carrier activities and use activity based costing to improve the accuracy of product costing and profitability analysis.      

本帖子中包含更多资源

您需要 登录 才可以下载或查看,没有帐号?注册

x
您需要登录后才可以回帖 登录 | 注册

本版积分规则

QQ|克米亚sap论坛,sap账号,sap系统,sap ides,sap学习机,sap练习环境 ( 渝ICP备18002525号-5 )

GMT+8, 2018-12-17 06:59

Powered by Discuz! X3.4

© 2001-2017 Comsenz Inc.

快速回复 返回顶部 返回列表